The example for the plant with 57 molding machines includes adding both a central drying and resin conveying system and is estimated to save the processor about $2,000,000/year by reducing energy consumption, labor and machine downtime and wasted materials.

The total system investment including installation was about $850,000.00

The payback was about 5 months.

This processor has also reduced their reject rate and increased production output and sales!